Dear,
We have the following background:
6 Branches that sends the After Image by FTP to HQ and there (HQ) it is made Roll-Forward to each database into specific folder nominated as branch name.
But if Something wrong happens in the sequence (I mean Lost sequence) we must restore the last backup again...
That procedure it is the only way that we have to go on with the rfutil roll forward? Or Can we run something specific to compare 2 databases and generate the Incremental Data?
Thanks indeed,
rrojo7229
We have the following background:
6 Branches that sends the After Image by FTP to HQ and there (HQ) it is made Roll-Forward to each database into specific folder nominated as branch name.
But if Something wrong happens in the sequence (I mean Lost sequence) we must restore the last backup again...
That procedure it is the only way that we have to go on with the rfutil roll forward? Or Can we run something specific to compare 2 databases and generate the Incremental Data?
Thanks indeed,
rrojo7229