I have this current cost set: 84.94
and Standard Cost Set: 290.397
I wonder by there is a huge variance here
Attached is the cost set for both
HOW COULD THIS HAPPEN?
There is not much changes for raw material in current cost
and Standard Cost Set: 290.397
I wonder by there is a huge variance here
Attached is the cost set for both
HOW COULD THIS HAPPEN?
There is not much changes for raw material in current cost