Hello all, I have found this site today and decided maybe it will help me in the long run...
About me, name is David, I reside in Boise, taking on a new position that needs me to be more knowledgeable <--(weird word)
Company I work for happens to have Syteline v6.01.00, yes I already realize that it is outdated. But they are not ready to upgrade yet. I had some prior knowledge of Syteline v6.01.01 from another company and it feels like I took a step backwards.
My biggest question is... Is there a something out there that I can get my hands on for materials to study this? I have looked through some of the threads and checked out some of the folks references, but it doesn't quite grab me.
I mean, of course, something along the lines of APS (Advanced Planning and Scheduling) systems.
thank you in advanced and great forum location and all that.
Have a wonderful day,
David
About me, name is David, I reside in Boise, taking on a new position that needs me to be more knowledgeable <--(weird word)
Company I work for happens to have Syteline v6.01.00, yes I already realize that it is outdated. But they are not ready to upgrade yet. I had some prior knowledge of Syteline v6.01.01 from another company and it feels like I took a step backwards.
My biggest question is... Is there a something out there that I can get my hands on for materials to study this? I have looked through some of the threads and checked out some of the folks references, but it doesn't quite grab me.
I mean, of course, something along the lines of APS (Advanced Planning and Scheduling) systems.
thank you in advanced and great forum location and all that.
Have a wonderful day,
David