Search results

  1. A

    Question connecting appserver from NET client

    Hi, Our webspeed progress application running in 10.2B (HP UNX) has already an interface with .Net through XMLAPI. Unfortunately the interface is not giving the expected results especially poor performance. Both systems are hosted in the same network. We are trying to use the .Net client...
  2. A

    Comparison operator

    I have a user table with one field (user-id) I have defined as character. Currently all the values in this field are numeric and I am able to get correct result while I execute the below query. Can you please tell me why progress is behaving like this? Is the below query is correct? for each...
  3. A

    Issue on 10.1B03

    Our progress version is 10.1B03 (RISC) in HP UX box(version 11.23). Our system usually experiencing a hanged broker and some times all brokers went to SENDING mode and persists for some time. This would even cause the performance issue and some time brokers were not available to process a new...
  4. A

    Webspeed Error 5810

    We are getting the following error in our webspeed. P-009662 T-000000 1 OCTO CON-AGT Msngr: Failed to make connection to WTA. Verify all port configuration for the specified servi ce are correct (5810): Error: -65, Agent Port: 3235 Our Application is webspeed architecture (HP UNIX SERVER)...
  5. A

    Type II storage and High Water Mark

    My progress database (10.1B) has a size of 56 GB in data area and the same is following Type 1 storage area. I am planning to move the tables from Type 1 to Type 2 by moving tables one by one. I heard that 62 GB is the maximum limit of Type 1 and I would like to know whether the value of HWM...
  6. A

    Index Rebuild Perfomance

    Hi, I want to perform an index rebuild on 70GB data base in HP Unix Machine with 10.2B05 ITANIUM Loaded. The server has 4 core CPU and 16 GB Memory now. Currently we are specifying the parameters such as -TB as 31 , -TM as 32 , -B 100000 in the idxbuild command. Could you please tell me the...
  7. A

    Disk Utlisation 100% during dump process

    I am doing parallel dump in HP Unix system with open edge 10.1B running. My data base size is around 70 GB and System memory is 8 GB. The database is offline while performing the proutil dump with -RO option. $DLC/bin/proutil $DUMPDB/ttgres -C dump cabininv $DCABININV -RO The current issue is...
  8. A

    Open Edge 10.1b Conversion

    I have an openedge database running under 10.1B RISC platform. I want to convert the existing DB to 10.2B Itanium platform. Could you please suggest me a fastest way to migrate the data base. Currently the database has around 70GB of data. Usually dump and load will take time and there will be a...
Top